IF IFUNGOO
IF IFUNGOO B2B
🗎 View Quote List (0) Request Pricing
IFUNGOO product evaluation
Supplier evaluation framework

Why Businesses Work with IFUNGOO

A structured way to evaluate modular electric propulsion products, technical evidence, compatibility work and partner support before a commercial decision.

4

Published thruster records

0

Published battery records

0

Published mount records

8

Other approved product records

Product ecosystem

Evaluate the system, not only the motor

IFUNGOO's current offer brings propulsion, energy storage, mounting, approved accessories, system configurations and technical records into one review path.

Electric thrusters

Compact and higher-power models are reviewed by individual model record.

Marine batteries

Voltage, capacity and document applicability can be checked against vessel requirements.

Steering mounts

Manual and electric steering mount records support installation discussion.

Approved accessories

The current accessory scope includes approved inverter and paddle board records.

Evidence-led review

Clear status before a commercial decision

Product records and technical documents should show what is confirmed, what requires confirmation and what must be tested.

Product fit

Review propulsion, battery, mount, craft and duty cycle together.

Structured record

Technical specifications

Display model-specific published values with clear source and test-condition notes.

Review source notes

Document applicability

Connect scope, version, issue date and applicable products.

Scope required

Real-world performance

Use local testing to account for vessel, load, water and battery conditions.

Test dependent

Modular compatibility review

Start with the craft and operating brief

A responsible recommendation connects the target vessel with load, steering, mounting position, battery voltage, capacity and test conditions.

01

Define the application

Craft type, dimensions, loaded weight, use pattern and operating water.

02

Map the modules

Compare product and system records against the brief.

03

Flag open questions

Keep model-specific specifications, compatibility and source conditions clearly organized.

04

Test locally

Record conditions and results before making performance claims.

System configuration Evaluation record

Y03 Dual-Drive Evaluation System

A dual-drive evaluation configuration based on the current manual reference: two Y03 thrusters and two B3 batteries. Final mounting, control, installation, and performance require engineering review.

Review configuration
System configuration Evaluation record

Y04 + B2 Compliance Reference Configuration

Reference configuration pairing one Y04 electric thruster with one B2 battery, based on the model combination stated in the current CE RED and FCC Part 15B documents.

Review configuration
System configuration Evaluation record

H01 + B50H Compliance Reference Configuration

Reference configuration pairing one H01 electric thruster with one B50H battery, based on the model combination stated in the current CE RED and FCC Part 15B documents.

Review configuration

Versioned technical documentation

Keep the evidence traceable

A document should be evaluated by version, issue date, scope, issuer and applicable product or system.

Certificate Published record

H01 + B50H CE RED Declaration of Conformity

Third-party Declaration of Conformity for the H01 electric thruster with B50H battery under the EU Radio Equipment Directive. The certificate...

Version
Issued copy dated 2026-05-27
Issue date
20260527
Open document record
Certificate Published record

Y04 + B2 FCC Part 15B Supplier’s Declaration of Conformity

Third-party Supplier's Declaration of Conformity covering FCC Part 15 Subpart B Class B for the Y04 electric thruster with B2...

Version
Issued copy dated 2026-06-17
Issue date
20260617
Open document record
Certificate Published record

Y04 + B2 CE RED Declaration of Conformity

Third-party Declaration of Conformity for the Y04 electric thruster with B2 battery under the EU Radio Equipment Directive. The certificate...

Version
Issued copy dated 2026-06-17
Issue date
20260617
Open document record
Certificate Published record

Y02 FCC Part 15B Supplier’s Declaration of Conformity

Third-party Supplier's Declaration of Conformity covering FCC Part 15B for the Y02 electric thruster.

Version
Issued copy dated 2024-06-14
Issue date
20240614
Open document record
Certificate Published record

Y02 CE EMC Declaration of Conformity

Third-party Declaration of Conformity for the Y02 electric thruster under the EU Electromagnetic Compatibility Directive.

Version
Issued copy dated 2024-06-14
Issue date
20240614
Open document record
Certificate Published record

Y01 FCC Part 15B Supplier’s Declaration of Conformity

Third-party Supplier's Declaration of Conformity covering FCC Part 15B for the Y01 electric thruster.

Version
Issued copy dated 2024-06-14
Issue date
20240614
Open document record

Published record

A document record is available with recorded metadata.

Scope required

Applicability must be checked against product and intended use.

Project confirmation

Open questions should be confirmed before publication or commitment.

Sample-to-Scale workflow

Move from evaluation to an informed supply discussion

The intended B2B journey is staged so product fit, evidence, compliance, branding and logistics can be reviewed before commitment.

  1. 01

    Brief

    Share the craft, load, use case, market and objectives.

  2. 02

    Select

    Review product records and compatibility questions.

  3. 03

    Sample

    Request a sample or evaluation configuration.

  4. 04

    Test

    Record installation, load, water and battery conditions.

  5. 05

    Scale

    Discuss commercial scope, documentation and supply requirements.

OEM engineering process

Discuss changes through a defined engineering brief

OEM and customization conversations should begin with the application, technical requirements, branding scope and validation plan.

Start an OEM project discussion

Engineering discussion areas

  • Application and integration

    Craft interface, mounting, steering, battery arrangement and operating environment.

  • Product and branding scope

    Applicable model, packaging, labels, manuals and requested product changes.

  • Validation plan

    Acceptance criteria, test conditions, evidence package and open questions.

  • Commercial handover

    Confirmed specifications, documents, packaging notes and responsibilities.

Manufacturing and quality discipline

Separate process evidence from marketing language

Specific inspection records, batch requirements and applicable documents should be reviewed for each project.

Application-led engineering

Tie product and system discussions to the craft and operating brief.

Project-specific quality review

Agree quality expectations and inspection points according to scope.

Traceable evidence

Review version, scope, issuer and applicability for technical documents.

Conditions recorded

Document vessel, load, installation, battery, water and weather conditions.

Partner support organization

Support the decision after the first conversation

Dealers, distributors, importers, brands, rental operators and project integrators can use the same structured brief for product, documentation, evaluation and commercial discussions.